New Life for Old Equipment |
|
Modernization? Yes, it's the right way to save
time and money!
Nowadays, due to apparent reducing and
cancellation of the bids for new power
generation equipment, steam turbines included,
and considering the fact that fuel costs for
conventional power plant, as a result of general
increasing tendency and owing to deficient
turbine economy, account for a major proportion
of the cost of electricity production,
modernization of existing, older-generation
turbines can often be an economically-attractive
choice.
More>>
|
|
| SoftInWay's
News |
|
Our Staff Additions
Softinway
has recruited Mr. Ryabinin as
an
Engineering Manager
of our
Turbine Stages Design Team
to strengthen our workforce capabilities in view
of new projects expansion.
More >>
|
|
| Openings
in SoftInWay |
|
We
currently invite you to explore the vacancies
that the links below are leading to:
Project
Manager, Engineering Consulting
Sales
Engineer/Project Manager
You will
join a strategically focused and highly
motivated team involved in Scientific,
Mechanical Engineering, Design Consulting and
Software Development incuding architecture,
design, development, migration, porting, enhancement and
QA. You also will have
an opportunity to work on multiple projects in a
flexible, friendly environment.
|
|
|
| Mirror
of SoftInWay's Innovations |
|
Innovative Approach to Traditional Power
Generation Equipment Engineering Problems
SoftInWay
offers innovative time and cost-effective
approach to
solving the coupled
problems of power generation equipment aerodynamics and heat
transfer.
More
>>
|
|
| SoftInWay's
Online Presentation |
|
An opportunity to view our abilities in Design
and Engineering Consulting at a glance!
The
presentation gives an overview of visualized
samples of SoftInWay's projects and solutions in
different kinds of our consulting services. This
presentation featured more viewer-oriented
approach with separate sections pertained to a
certain kind of activity, now with wide array of
rotating and other kinds of machinery Design
applications along with CFD, Heat Transfer,
Structural/Thermostructural, Visualization and
Software development.
View
>>
|
|
| Welcome
to our Science Club! |
|
New Mechanical Engineering Papers!
New
Benchmarks for Steam Turbine Efficiency
Information
Support for Turbine Operators
Calculation of
friction work for cyclic loading of joint
structuresMore
articles >>
|
|
|
|
|
New Life for Old Equipment |
|
Old Turbine Dilemma: Fix It, Or
Replace It?
This
is a question faced by all turbine operators at
some point. Aging machine becomes less and less
efficient, or an old machine was not very
efficient to begin with, or some changes have been
made over the years to other parts of a power
generating plant, such as boiler, water cooling
system, power lines, etc., that made the whole
plant work off the peak of it’s capacity and
efficiency. All of this results in losing money.
But
replacement of the old turbine with the brand new
one costs a lot of money, too. The cheapest way of
fixing the machine is to replace the old worn out
parts with new identical ones; however, it’s not
the most efficient way. There is a middle way, as
illustrated on the diagram: for a moderate price
you can retrofit the old turbine with new
re-designed parts and easily improve the
efficiency of the machine by 10%, or even more.
Advanced modern computational techniques allow
coupled fluid-thermo-mechanical 3D modeling of the
flow path and other parts of turbine, which leads
to development of aerodynamically efficient nozzle
vane and blade profiles, design of twisted and
curved vanes and blades with variable chords along
the height, enhancement of flow path meridian
lines, improvement in design of diaphragms and
cascade seals, reduction in radial and axial
clearances in labyrinth seals, etc.
There could be yet another reason to upgrade your
power plant: turbine power carrying capacity does
not correspond to the real output of the steam
generating equipment. It means that either power
generating capacity of the turbine exceeds the
steam generating capacity of the boiler, or vice
versa. In the first case, turbine permanently
operates under partial load, which is not optimal
regime. In the second case, the boiler works at
lowered efficiency. In this case operator also has
an option of using all available steam capacity
and produce more electrical power.
Modern engineering analysis tools can be used to
optimize the mode of operation of the power plant.
Generally, it is possible to modernize the turbine
steam distribution system, and/or connect the
turbine to several boilers that generate steam
with different parameters. For example: the steam
with maximum pressure is supplied to the turbine
head, while the flow of lower pressure steam is
directed to intermediate stages.
Here is the another example of total power
generating plant optimization. There could be
situations when there are customers in vicinity of
power plant that are looking for hot steam. For
example, steam might be needed for some
technological processes, or neighboring
green-houses, apartment and office complexes need
steam for heating. This need can be fulfilled by
directing the steam from the intermediate stages
of turbine to these customers, and not to cooling
systems. Of course, it will slightly lower
production of electric power, however much more
thermal power will be available for usage. The
total power production will be increased, and
thermal pollution of the environment will be cut
down.
So
the bottom line is that optimization and
modernization of your power generating plant and
its components is not necessarily expensive
undertaking any more, it will pay for itself
within a year or two. Please, contact
SoftInWay, Inc. (www.softinway.com)
for more details.
|
|
|
Mirror
of SoftInWay's Innovations |
|
Solving the Coupled Problems of Aerodynamics and
Heat Transfer
 |
The solution of complex coupled problems of
aerodynamics and heat transfer by
performing more accurate and integrated
modeling is the most comprehensive and
effective way to increase
power generation
equipment efficiency, which has been
the fundamental machinery problem. Such
approach meets most stringent customer
requirements for any kind of power
generation equipment design and operation.
SoftInWay offers a really innovative way
to solve the problem on the basis of
coupled analysis in the areas with
intricate nature of the flow, and by
applying reliable experimental data for
well-studied elements.
For more detailed description
click here |
|
|
| Staff
Additions |
|
Widening
a field of operations on new projects,
SoftInWay, Inc. designated Mr. Vladimir Ryabinin,
P.E., to the position of Turbine Stages Design
Team Engineering Manager. Mr. Ryabinin was
recruited to lead the works pertained to last
stages design and engineering due to the fact
that this part of SoftInWay’s work weighs more
and more in a total volume of our company’s
portfolio. Having an extensive 23+ years
background in turbomachinery, Mr. Ryabinin is
mostly known as a highly skilled expert in
design of flow path and last stages of steam turbines. His responsibilities include
problems of turbine stages design, general and
detail management of a project’s part pertained
to last stages elements and units. As a Leading
Engineer and Project Manager, Vladimir has
executed an impressive range of projects referred
to original design and modernization of steam
turbine Low Pressure Cylinders including such
projects as Development and Optimization of LPC
Sections of Large Steam Turbines with 300, 600,
1000 (at 1500 rpm), and 1000 MW (at 1000 rpm)
rated capacity, Design of Long Blades (423 to
1650 mm) for Last and Next-to-Last Stages of LPC
with Non-Standard Geometry featured variable
thermal and geometrical parameters along the blade
height, etc.
Vladimir holds Masters Degree from Kharkov State
Polytechnic University and prior to SoftInWay
held senior engineering and management
responsibilities in turbomachinery corporations.
“I
am sure that Vladimir’s experience and deep
expertise in turbine design is a substantial
value-add to our Design Team and his work will
strengthen our positions as a leading provider
of innovative turbomachinery solutions,” – said
Dr. Leonid Moroz, SoftInWay’s President and CEO.
” His commitment to work supported by rich
professional experience will be applied to
foster the company’s leadership to build new
reliable unsurpassed solutions that will bring
profitable growth for SoftInWay”.
|
|
| Openings
in SoftInWay |
|
Welcome
to join SoftInWay Incorporate!
As
we expand our base of opportunities, so does the need for adding talent
resources to support our growth expands. We are always searching for staff
additions that have the professional skill set, corporate discipline, and the
solution development creativity to match our client’s technology challenges.
Since our
company was established as a Scientific and
Engineering based Outsourcing Service Provider
to the global IT and Mechanical Engineering
world, the dominant objective of our activity is
to provide “Client Specific Solutions.”
Technical excellence is our committed customer
goal. The sharing of this goal is the
fundamental core characteristic for anyone
seeking a position in SoftInWay.
You will
join a strategically focused and highly
motivated team involved in Scientific,
Mechanical Engineering, Design Consulting and
Software Development incuding architecture,
design, development, migration, porting, enhancement and
QA. You also will have
an opportunity to work on multiple projects in a
flexible, friendly environment.
We
currently invite you to explore the vacancies
presented below:
Project
Manager, Engineering Consulting
This individual will be
responsible for all-round technical preparation and evaluation of project
proposals in FEA-based CFD, Heat Transfer, Stress- Strain areas. Recommending
improvements, the project’s technical issues coordination including problems’
review, sophisticated model description, precise boundary conditions evaluation,
and gathering and analysis of other data required for providing further non-stop
development process.
Also responsible
for building and maintaining development
schedules and fulfilling project deliverables on
time, from inception to client sign-off. Beyond
this, the candidate needs to have very sharp
analytical skills, which s/he will use through
the project life cycle, including detailed
pre-development proposal analysis, projects
feasibility estimation, and user requirements
analysis.
Requirements:
- Masters
Degree or Bachelors in Mechanical Engineering
with significant related experience. Computed
Science Degree is desirable.
- 5+
years of complex Mechanical Engineering project
management, engineering application development,
design, and implementation experience.
- Experience
in FEA-contained packages’ implementation
like ANSYS and/or similar toolkits is
required.
- Principle
knowledge in CFD, Heat Transfer, Stress-Strain,
Machine Design is extremely appreciated.
- Must
be strongly focused and extremely organized.
- Proven
experience in writing specifications, quality
assurance, project complexity, labor effort
estimation, and risk analysis skills.
- Exceptional
oral and written communications skills are
essential.
- PMI
certification is a plus.
Sales
Engineer/Project Manager
The
essential job function of this person is business
development and sales of engineering/software
development consulting services including:
-
forecast development to achieve national sales
goals,
-
developing and implementing a strategic sales plan
to achieve national
sales goals;
-
identify, close and maintain key accounts;
-
provide information to marketing to improve
products and profitability;
-
monitor and assess major competitors' activities
and products.
The
person will perform sales work inside and outside
in support of SoftInWay's engineering services for
diverse industries including Aerospace, Power
Generation, Automotive, Energy, Petrochemical,
Utilities, Gas, etc. He/She will prepare proposals
or service contracts for SoftInWay's engineering
services with deep understanding of customer
requirements and company's team Design and
Engineering abilities in FEA-based CFD, Heat
Transfer, and Structural applications development.
Coordinate and schedule marketing activity. Serve
as Project Manager for various projects, both
temporary and ongoing.
Requirements:
•
Minimum 4 year Degree in Mechanical Engineering or
related areas with significant related experience.
• 5 - 8 years experience of surpassing sales
quotas in selling consulting services to C-level
executives in engineering and scientific.
• Principle knowledge in CFD, Heat Transfer,
Stress-Strain, Machine Design, CAD/CAE, and
Visualization is appreciated. Knowledge
of MS Office and MS Project is a plus.
•
Excellent prospecting and presentation skills .
• Must be strongly focused and extremely
organized.
• Exceptional oral
and written communications skills are essential.
We
will be happy to see you in our team, supported
by a whole suite of customary benefits.
|
|
|
|
|