|
Figure 8. 6 stages counter-rotating turbine design
Selection of rotation speed for this design was performed in the same way, i.e. using DoE study for
range of rotation speed variables basing on the highest efficiency criterion. For 6 stages second
shaft rotation speed was chosen equal to 4500 RPM
Figure 9. Efficiency chart vs rotation speeds (6 stages)
COMPARISON OF INITIAL AND COUNTER-ROTATING TURBINE PERFORMANCES
Integral Performances Comparison. Comparison of integral and detailed thermodynamic
performances of both turbines is presented in this part. All results were obtained in 2D streamline
calculation on 7 stations spanwise along all flow path. Task formulation used for calculation was
“Finding mass flow rate for static outlet pressure”, calculation was performed with assumption of
turbine operating on design mode, i.e. with incidence angles corresponding to minimal losses.
|